Hello,
I have a scenario where We receive the material in 902 Storage type with Stock Type "Q" when GR is made. This GR creates a TR for moving the material to its destination bin. As per the config this is subjected to Auto TO and Immediate TO creation but this is held as the Usage decision is not made. Once the UD is made and if the entire material is rejected and stock is posted to Blocked stock. In WM this changes the stock type to 902 "S" Blocked stock from 902 "Q" Quality stock.
Now the TR created by GR which was awaiting to be converted by the background job is converted to TO. This TO created suggests a movement from 902 "S" to HRS (destination storage type) "S". This is not required and we don't want to have this TR converted to TO as this material should directly be moved out to Vendor from 902 S.
Any idea how we can avoid conversion of such TR created from GR where the UD is made and material is Rejected. As this should not be transferred to the Destination storage type as this will be returned directly from the 902 S.
Thanks,
AK