Hi Gurus,
We are having many batch jobs for running MRP for different plants.
A background job was failed when someone was manually doing MRP for same plant.My query is if user A is running MD02 for a material A under the plant X and another user B is attempting to run MD02 for material B under the plant X,will the second one fail? Can you also tell if the same error will occur if user A is running MD01 for plant X and another user B is attempting to run MD02 for material B under the plant X?